New signs up Road Works 17/8/2015 for 38 Days. Anybody know what is going on???

BFA
Advanced Member

United Kingdom
410 Posts

Posted - 06 Aug 2015 :  15:34:42  Show Profile  Reply with Quote

C618 STATION ROAD

ANGMERING

17 Aug 2015

09 Oct 2015

Toucan crossing installation as part of cycle scheme.
Two-Way Signals.
Contact: West Sussex Highways 01243 642105
Go to Top of Page

roosterbri
Advanced Member

United Kingdom
553 Posts

Posted - 06 Aug 2015 :  16:13:19  Show Profile  Reply with Quote
Cheers BFA. Not much thought gone into doing it in the school holidays then. It only took them 3 weeks to do the Windmill Bridge crossing but this is going to take 5 weeks. Sheeesh!!!
Go to Top of Page

BFA
Advanced Member

United Kingdom
410 Posts

Posted - 06 Aug 2015 :  23:20:57  Show Profile  Reply with Quote
Maybe they'll only be doing it at night but it does seem a rather long time even if that is the case. Never be surprised at anything WSCC highways say ... or do.

Go to Top of Page

neil
Forum Owner / Moderator

United Kingdom
2623 Posts

Posted - 07 Aug 2015 :  09:06:50  Show Profile  Reply with Quote
Hopefully the 35 days will cover the whole scheme which also includes a cycle and pedestrian path from the traffic lights on the A259 by South Drive to the new Toucan crossing in Station Road which it is understood will replace the first build-out.

It would therefore be sensible if the Station Road work was done first during the school holidays. But this is WSCC!!!

Once the corn is cut in the field north of the A259, contractors vehicles could park on that land during construction of the path which would minimise the impact to traffic on the A259.
Go to Top of Page

Pansy
Senior Member

United Kingdom
172 Posts

Posted - 08 Aug 2015 :  18:04:16  Show Profile  Reply with Quote
Sensible planning and timing of road works do not seem to be something with which W.S.C.C. concern themselves. Agree with your comments, Neil, that work should have began immediately when the school holidays started!
Go to Top of Page

Pansy
Senior Member

United Kingdom
172 Posts

Posted - 08 Aug 2015 :  18:15:38  Show Profile  Reply with Quote
Sensible planning and timing of road works do not seem to be something with which W.S.C.C. concern themselves. Agree with your comments, Neil, that work should have began immediately when the school holidays started!
Go to Top of Page

roosterbri
Advanced Member

United Kingdom
553 Posts

Posted - 19 Aug 2015 :  12:25:13  Show Profile  Reply with Quote
quote:
Originally posted by neil

Hopefully the 35 days will cover the whole scheme which also includes a cycle and pedestrian path from the traffic lights on the A259 by South Drive to the new Toucan crossing in Station Road which it is understood will replace the first build-out.

It would therefore be sensible if the Station Road work was done first during the school holidays. But this is WSCC!!!

Once the corn is cut in the field north of the A259, contractors vehicles could park on that land during construction of the path which would minimise the impact to traffic on the A259.



Not enough bodies or machinery to tackle from both ends of proposal
Go to Top of Page

roosterbri
Advanced Member

United Kingdom
553 Posts

Posted - 03 Sep 2015 :  12:49:23  Show Profile  Reply with Quote
Why are they not working on the west side??? Oh of course needs more men and machines.!!
Go to Top of Page

neil
Forum Owner / Moderator

United Kingdom
2623 Posts

Posted - 08 Sep 2015 :  11:17:00  Show Profile  Reply with Quote
Reducing the eastbound carriageway to one lane on the A259 is causing queues of about 800 yards back along the Rustington by-pass.

Now that the crops have been cut in the field opposite Sainsburys, I wonder whether, with cooperation from the farmer, the vehicles used for the new path construction could have use the fields rather than closing the carriageway and causing all the inconvenience. Perhaps that's too simple!