Posted - 06 Aug 2015 : 15:20:42
|
New signs up Road Works 17/8/2015 for 38 Days. Anybody know what is going on??? |
|
BFA
Advanced Member
    
United Kingdom
410 Posts |
Posted - 06 Aug 2015 : 15:34:42
|
C618 STATION ROAD
ANGMERING
17 Aug 2015
09 Oct 2015
Toucan crossing installation as part of cycle scheme. Two-Way Signals. Contact: West Sussex Highways 01243 642105 |
 |
|
roosterbri
Advanced Member
    
United Kingdom
553 Posts |
Posted - 06 Aug 2015 : 16:13:19
|
Cheers BFA. Not much thought gone into doing it in the school holidays then. It only took them 3 weeks to do the Windmill Bridge crossing but this is going to take 5 weeks. Sheeesh!!! |
 |
|
BFA
Advanced Member
    
United Kingdom
410 Posts |
Posted - 06 Aug 2015 : 23:20:57
|
Maybe they'll only be doing it at night but it does seem a rather long time even if that is the case. Never be surprised at anything WSCC highways say ... or do.
|
 |
|
neil
Forum Owner / Moderator
    
United Kingdom
2623 Posts |
Posted - 07 Aug 2015 : 09:06:50
|
Hopefully the 35 days will cover the whole scheme which also includes a cycle and pedestrian path from the traffic lights on the A259 by South Drive to the new Toucan crossing in Station Road which it is understood will replace the first build-out.
It would therefore be sensible if the Station Road work was done first during the school holidays. But this is WSCC!!!
Once the corn is cut in the field north of the A259, contractors vehicles could park on that land during construction of the path which would minimise the impact to traffic on the A259. |
 |
|
Pansy
Senior Member
   
United Kingdom
172 Posts |
Posted - 08 Aug 2015 : 18:04:16
|
Sensible planning and timing of road works do not seem to be something with which W.S.C.C. concern themselves. Agree with your comments, Neil, that work should have began immediately when the school holidays started! |
 |
|
Pansy
Senior Member
   
United Kingdom
172 Posts |
Posted - 08 Aug 2015 : 18:15:38
|
Sensible planning and timing of road works do not seem to be something with which W.S.C.C. concern themselves. Agree with your comments, Neil, that work should have began immediately when the school holidays started! |
 |
|
roosterbri
Advanced Member
    
United Kingdom
553 Posts |
Posted - 19 Aug 2015 : 12:25:13
|
quote: Originally posted by neil
Hopefully the 35 days will cover the whole scheme which also includes a cycle and pedestrian path from the traffic lights on the A259 by South Drive to the new Toucan crossing in Station Road which it is understood will replace the first build-out.
It would therefore be sensible if the Station Road work was done first during the school holidays. But this is WSCC!!!
Once the corn is cut in the field north of the A259, contractors vehicles could park on that land during construction of the path which would minimise the impact to traffic on the A259.
Not enough bodies or machinery to tackle from both ends of proposal |
 |
|
roosterbri
Advanced Member
    
United Kingdom
553 Posts |
Posted - 03 Sep 2015 : 12:49:23
|
Why are they not working on the west side??? Oh of course needs more men and machines.!!
|
 |
|
neil
Forum Owner / Moderator
    
United Kingdom
2623 Posts |
Posted - 08 Sep 2015 : 11:17:00
|
Reducing the eastbound carriageway to one lane on the A259 is causing queues of about 800 yards back along the Rustington by-pass.
Now that the crops have been cut in the field opposite Sainsburys, I wonder whether, with cooperation from the farmer, the vehicles used for the new path construction could have use the fields rather than closing the carriageway and causing all the inconvenience. Perhaps that's too simple! |
 |
|
|