Angmering Forums
Angmering Forums
Home | Profile | Register | Active Topics | Members | Search | FAQ
 All Forums
 Specifically Angmering (Category)
 Angmering Roads & Paths - Forum
 South End of Station Road

Note: You must be registered in order to post a reply.
To register, click here. Registration is FREE!

Screensize:
UserName:
Password:
Format Mode:
Format: BoldItalicizedUnderlineStrikethrough Align LeftCenteredAlign Right Horizontal Rule Insert HyperlinkInsert Email Insert CodeInsert QuoteInsert List
   
Message:

* HTML is OFF
* Forum Code is ON
Smilies
Smile [:)] Big Smile [:D] Cool [8D] Blush [:I]
Tongue [:P] Evil [):] Wink [;)] Clown [:o)]
Black Eye [B)] Eight Ball [8] Frown [:(] Shy [8)]
Shocked [:0] Angry [:(!] Dead [xx(] Sleepy [|)]
Kisses [:X] Approve [^] Disapprove [V] Question [?]

 
Check here to subscribe to this topic.
   

T O P I C    R E V I E W
roosterbri Posted - 06 Aug 2015 : 15:20:42
New signs up Road Works 17/8/2015 for 38 Days. Anybody know what is going on???
9   L A T E S T    R E P L I E S    (Newest First)
neil Posted - 08 Sep 2015 : 11:17:00
Reducing the eastbound carriageway to one lane on the A259 is causing queues of about 800 yards back along the Rustington by-pass.

Now that the crops have been cut in the field opposite Sainsburys, I wonder whether, with cooperation from the farmer, the vehicles used for the new path construction could have use the fields rather than closing the carriageway and causing all the inconvenience. Perhaps that's too simple!
roosterbri Posted - 03 Sep 2015 : 12:49:23
Why are they not working on the west side??? Oh of course needs more men and machines.!!
roosterbri Posted - 19 Aug 2015 : 12:25:13
quote:
Originally posted by neil

Hopefully the 35 days will cover the whole scheme which also includes a cycle and pedestrian path from the traffic lights on the A259 by South Drive to the new Toucan crossing in Station Road which it is understood will replace the first build-out.

It would therefore be sensible if the Station Road work was done first during the school holidays. But this is WSCC!!!

Once the corn is cut in the field north of the A259, contractors vehicles could park on that land during construction of the path which would minimise the impact to traffic on the A259.



Not enough bodies or machinery to tackle from both ends of proposal
Pansy Posted - 08 Aug 2015 : 18:15:38
Sensible planning and timing of road works do not seem to be something with which W.S.C.C. concern themselves. Agree with your comments, Neil, that work should have began immediately when the school holidays started!
Pansy Posted - 08 Aug 2015 : 18:04:16
Sensible planning and timing of road works do not seem to be something with which W.S.C.C. concern themselves. Agree with your comments, Neil, that work should have began immediately when the school holidays started!
neil Posted - 07 Aug 2015 : 09:06:50
Hopefully the 35 days will cover the whole scheme which also includes a cycle and pedestrian path from the traffic lights on the A259 by South Drive to the new Toucan crossing in Station Road which it is understood will replace the first build-out.

It would therefore be sensible if the Station Road work was done first during the school holidays. But this is WSCC!!!

Once the corn is cut in the field north of the A259, contractors vehicles could park on that land during construction of the path which would minimise the impact to traffic on the A259.
BFA Posted - 06 Aug 2015 : 23:20:57
Maybe they'll only be doing it at night but it does seem a rather long time even if that is the case. Never be surprised at anything WSCC highways say ... or do.

roosterbri Posted - 06 Aug 2015 : 16:13:19
Cheers BFA. Not much thought gone into doing it in the school holidays then. It only took them 3 weeks to do the Windmill Bridge crossing but this is going to take 5 weeks. Sheeesh!!!
BFA Posted - 06 Aug 2015 : 15:34:42

C618 STATION ROAD

ANGMERING

17 Aug 2015

09 Oct 2015

Toucan crossing installation as part of cycle scheme.
Two-Way Signals.
Contact: West Sussex Highways 01243 642105